Feb 27-March 12, 2017
* Painted the starter ring gear in the red used other places. The propeller is being prepared to go to Rocky Mountain Prop for overhaul, a change in drive bolts to 1/2", and changing the spinner to 13".
* All the landing gear intersection fairings were completed and installed.
* Ran the flap motor for the first time. The flaps transition 23 degrees.
* Connected the fuel hoses up to the fuel sector valve.
* Finished filling and sanding the elevator trim push-rod fairing.

Painted Ring Gear

Prop & Ring Gear

Unfinished Upper Rt LG Fai

Unfinished Upper Rt LG Fairing

Unfinished Upper Rt LG Fai

Upper Rt LG Fairing

Upper Rt Landing Gear Fairing

Unfinished Upper Lt LG Fai

Upper Lt LG Fairing