top of page
Feb 27-March 12, 2017
* Painted the starter ring gear in the red used other places. The propeller is being prepared to go to Rocky Mountain Prop for overhaul, a change in drive bolts to 1/2", and changing the spinner to 13".
* All the landing gear intersection fairings were completed and installed.
* Ran the flap motor for the first time. The flaps transition 23 degrees.
* Connected the fuel hoses up to the fuel sector valve.
* Finished filling and sanding the elevator trim push-rod fairing.
Painted Ring Gear
Prop & Ring Gear
Unfinished Upper Rt LG Fai
Unfinished Upper Rt LG Fairing
Unfinished Upper Rt LG Fai
Upper Rt LG Fairing
Upper Rt Landing Gear Fairing
Unfinished Upper Lt LG Fai
Upper Lt LG Fairing
bottom of page