top of page

Feb 27-March 12, 2017

*  Painted the starter ring gear in the red used other places. The propeller is being prepared to go to Rocky Mountain Prop for overhaul, a change in drive bolts to 1/2", and changing the spinner to 13".

*  All the landing gear intersection fairings were completed and installed.

*  Ran the flap motor for the first time. The flaps transition 23 degrees.

*  Connected the fuel hoses up to the fuel sector valve.

*  Finished filling and sanding the elevator trim push-rod fairing.

bottom of page