January 2nd, 2016
* Laid out parts and photographed them to be able to know if they were delivered
* Bolted the elevator tie rod to each elevator
* Found neutral position for the elevators. (4 deg down at the elevator widest part)
* Set elevators up for 25 Deg above neutral
* Set 1/8" clearance for forward elevator bellcrank
* Used rib stitch cord to find exact distance from mounting holes on elevator bellcranks for push/pull tube
* Cut tube to length, opened tube ends to accept rod ends
* Drilled and bolted rod ends to push tube
* Added bearing ball ends and set to length
* Installed elevator push tube and secured at both ends to bellcranks
* Installed rudder and found that it rubs on elevator in the up movement. It will have to have material removed or the elevator hing line moved forward
* Opened holes to 1" in rear bulkhead for rudder cable clearance
* Marked both front and back cockpit flanges along scribe line molded into gellcoat. Randy Edwards helped mark the lines since they were very hard to see.
* Sanded flange to match marked line.
Left side