April 22-27, 2016

*  Got lots done the last few days. The seam at the upper fuselage joint was sanded, filled and sanded again. It is almost ready to paint with sandable primer. Also, filled & sanded the instrument panel, horizontal stabilizers, elevators and trim tab. That still needs work before painting. Assembled the brake/rudder pedals and fabricated the support beams for them. Installed pedal assembly. Everything  moves perfectly.  Now it is ready to fabricate the flute tube support and add rudder cables.